SampleKaro
← All guides/Starting a brand

How Many Pieces Should My First Clothing Order Be?

Gaurav Batra · Founder, SampleKaro11 Aug 20265 min read

Short answer

Order the smallest quantity you can realistically sell in a few months while still meeting the factory's minimum. Make one sample first — it takes 7 to 14 days once confirmed — then commit to bulk. A small first run costs more per piece but ties up far less cash than overordering.

Your first clothing order should be the smallest quantity that (a) meets the factory's minimum and (b) you can realistically sell within a few months. For most first-time founders that means a small, boring number — not the big run you're picturing. A small run costs more per piece, but it protects the one thing you can't get back: your cash.

Below is how to think about the quantity, why the per-piece maths works the way it does, and what to ask before you commit.

What is an MOQ and who sets it?

MOQ stands for Minimum Order Quantity — the smallest number of pieces a factory will produce for a given style. You don't pick the MOQ out of thin air; it's driven by real constraints:

  • Fabric. Mills sell fabric in rolls and dye in batches. If a colour has to be dyed to order, the dyeing minimum can set your floor, not the stitching.
  • Construction. A complex garment with multiple panels, linings and trims takes more setup, so the minimum tends to be higher.
  • Finishing. Printing, embroidery and washing each carry their own batch minimums.

This is also why we don't publish a rate card. At SampleKaro every job is quoted per order against your actual tech pack, because fabric, quantity, construction and finishing all move the number. A single "price per piece" would be misleading before we've seen the garment.

So the honest answer to "what's the MOQ?" is: it depends on your fabric and your style. Ask for it in writing, per style and per colour.

Why does a smaller order cost more per piece?

Because the fixed costs of a production run get divided across fewer pieces.

Every run carries setup that happens once no matter how many pieces you make: pattern grading, marker making, cutting setup, threading machines, print screens, a fabric minimum you may not fully use. Spread that over 50 pieces and each piece carries a big share. Spread it over 500 and each piece carries a small share.

So the per-piece number falls as quantity rises. That's real. But it tempts founders into a trap: ordering more than they can sell just to chase a lower per-piece cost.

Small order vs large order — what's the real trade-off?

The cheaper per-piece cost of a big run is only a saving if you sell everything. Unsold stock isn't a discount — it's dead cash sitting in boxes. Here's the shape of the decision:

FactorSmall first runLarge first run
Cost per pieceHigherLower
Total cash you must put inLowerHigher
Cash at risk if it doesn't sellLowerHigher
Speed to learn what customers wantFasterSlower
Ability to fix mistakes on the next runEasyExpensive
Best forFirst-time founders testing a marketProven styles with steady demand

Read the middle rows carefully. A large run wins on per-piece cost and loses on almost everything a first-time brand actually cares about: cash, flexibility and learning speed.

Here's the logic without any invented rupee figures. Say a bigger run cuts your per-piece cost by a quarter. If you sell your whole small run but only sell half of your big run, the big run's "cheaper" pieces have cost you far more in unsold stock than you ever saved. The saving is only real at full sell-through — and a first-time founder has no data yet to promise that.

Should I make a sample before ordering in bulk?

Yes. Always. One sample before any bulk decision.

A sample is the physical version of your tech pack. It tells you whether the fit, fabric weight, stitching and finishing match what's in your head — before you commit money to hundreds of pieces of the same mistake. A tech pack that reads perfectly can still produce a garment that hangs wrong or uses a fabric that's heavier than you expected.

How it works with us:

  • A sample takes 7 to 14 days once the sample order is confirmed. The clock starts when payment clears, not when you send the tech pack. Fabric sourcing is the usual reason a sample lands at the far end of that window.
  • A sample order is paid 100% upfront. The order is only created once payment on the accepted quote clears. There's no part-payment on samples.

Bulk production terms are set separately, per order, on the quote itself — including the timeline, which we confirm against your quantity and fabric rather than promising a standard number.

So what number should I actually write down?

Work backwards from selling, not from the factory minimum. Ask yourself:

  1. How many can I realistically sell in three months? Be honest. If you have no audience yet, this number is small.
  2. What's the MOQ for my fabric and style? Get it per colour. If you want three colours, you may be facing three minimums.
  3. How much cash can I lose without it ending the brand? Your first order is tuition. Size it so a slow-selling run is a lesson, not a closure.

Your first order quantity is the highest of your MOQ and your honest three-month sales estimate — and no higher. If your sales estimate is below the MOQ, that's a signal to simplify: fewer colours, or a fabric with a lower minimum.

What should I ask a manufacturer before committing?

Before you confirm anything, get these in writing:

  • The MOQ, stated per style and per colour.
  • What's driving that MOQ — is it the fabric, the dyeing, or the finishing?
  • The per-piece cost at your target quantity, quoted against your actual tech pack.
  • The bulk timeline for your specific order.
  • What a sample costs and how long it takes.

If a quote arrives without you sending a tech pack first, treat it as a guess. Fabric, quantity, construction and finishing all move the price — a number given before those are known can't be firm.

What to do next

Start with the sample. Get your tech pack together, get it quoted, and hold a physical piece in your hands before you decide on any bulk number. Once you've seen the sample and know the MOQ behind it, size your first run to what you can sell — not to the per-piece discount.

If you're still earlier than this and haven't set the brand up yet, read how to start your own clothing brand in India first, then come back to the quantity question.

Send us your tech pack when you're ready and we'll quote the sample and the bulk run against it — no rate card, no guesswork.

Common questions

Is there a fixed minimum order at SampleKaro?+

There's no single published minimum, because the floor is usually set by your fabric and finishing rather than by us. Dyeing batches, roll sizes and print minimums differ by style. Send your tech pack and we'll tell you the MOQ for your specific garment and colours in writing.

How much does a sample cost?+

It's quoted per order against your actual tech pack, since fabric, construction and finishing all change the number. What is fixed: a sample is paid 100% upfront, and the order is only created once that payment clears. There are no hidden fees on top.

How long before I get my sample?+

A sample takes 7 to 14 days once the sample order is confirmed. The clock starts when your payment clears, not when you send the tech pack. Sourcing the fabric is the most common reason a sample lands at the later end of that window.

Should I order more to get a lower price per piece?+

Only if you're confident you'll sell it all. A larger run does lower the per-piece cost, but the saving is only real at full sell-through. For a first-time brand with no sales data, unsold stock usually costs more than the per-piece discount ever saved.

What's the bulk production timeline?+

We confirm it per order rather than quoting a standard lead time, because it depends on quantity, fabric availability and finishing. The timeline is written into your production quote so you have a firm date before you commit, not a generic promise.

Keep reading